Construction of the Chico-Oroville route’s big challenge was crossing the Feather River, and maintaining a trestle over land that was subject to flooding and the intensive gold dredging efforts of the Natomas Cons. Co. Upper left, west view of bridge construction, Jan. 29, 1906; upper right, west view from trestle of right-of-way, circa 1910; Lower left, final structure, northwest view, circa 1910; lower right, final structure, southeast view, showing overhead catenary and dredge alongside trestle, circa 1910.
L146-90-Courtesy BAERA, Western Railway Museum Archives, 108538sn, 108555sn, 108553sn, 108577sn ,
(Image
19
of
32)